Pix 1: Hon. Minister of Power, Works & Housing, Mr Babatunde Fashola, SAN (middle), being conducted round the 2 X 60 MVA 132/33 KV Sub- Station Pankshin by the Deputy Managing Director of the Transmission Company of Nigeria, Dr Abubakar Atiku (left) during the Minister’s ongoing inspection , verification and fact-finding tour of the projects in the North Central Zone as part of a nationwide tour of the Ministry’s projects on Wednesday, 27th January 2016
Pix 2: Hon. Minister of Power, Works & Housing, Mr Babatunde Fashola, SAN (middle), being conducted round the 2 X 60 MVA 132/33 KV Sub- Station Pankshin by Deputy Managing Director of the Transmission Company of Nigeria, Dr Abubakar Atiku . With them is the Hon. Commissioner for Water Resources & Energy in Plateau State, Engr. David Jaafaru (right) during the ongoing inspection , verification and fact finding tour of the projects in the North Central Zone as part of a nationwide tour of the Ministry’s projects on Wednesday, 27th January 2016.
Pix 3: STALLED BY COMMUNITY ISSUES: Hon. Minister of Power, Works & Housing, Mr Babatunde Fashola, SAN (middle), while being conducted round the 2 X 60 MVA 132/33 KV Sub- Station Pankshin by Deputy Managing Director of the Transmission Company of Nigeria, Dr Abubakar Atiku (inset) points at the uncompleted 132 KV line from Jos stalled as a result of community right of way issues during the Minister’s ongoing inspection , verification and fact finding tour of the projects in the North Central Zone as part of a nationwide tour of the Ministry’s projects on Wednesday, 27th January 2016.
PIX 4: Hon. Minister of Power, Works & Housing, Mr Babatunde Fashola, SAN (right), being briefed about the progress of work on the Lafia – Awe road by the Controller of Works Nasarawa State, Engr. Celestine Shausu,(2nd right),the Director, Federal Highways (North Central), Engr. Abubakar Gambo (2nd left) and Project Engineer of Triacta Nigeria Ltd, Mr Hadi Kiwau (left), during the ongoing inspection , verification and fact finding tour of the Ministry’s projects in the North Central Zone as part of a nationwide tour of projects on Wednesday, 27th January 2016.